
QUESTIONS ANSWERED
Do I need Planning Permission for an Extention?
If it is to be attached to an existing house, up to 40m2 is exempt from planning, provided that there is 25m2 of free space is left in your garden.
If it is to be a free standing building eg. Mbuild garden pod, up to 25m2 is exempt from planning.
We can guide you through this process, and if need be, you can avail of our planning application service.
Are Groundworks and Breakout costs included?
Groundwork and break out costs are not included in your quote, however after the initial site visit, we can advise you on the additional costs.
How are your buildings built?
All our buildings are built using steel frames and insulated to achieve A BER ratings. They meet all planning and building regulations.
Why Steel ?
Using steel has several compelling advantages
-
Strength and durability
-
Speed of construction
-
Design flexibility
-
Fire resistance
-
Pets and rot resistance
-
Precision and quality control